TAŞLIGÜNEY II VIADUCT
Taşlıgüney viaduct is situated on the Horasan-Sarıkurt-Sarıkamış road, between Km:90+893.400 and Km:91+467.100. Total length : 573.7m. 409.1 m. Super Structure: Cast-in-situ, post tensioned concrete box section. Construction Method: Balanced Cantilever Maximum span length : 134.5m. Width: E=2-13.5m Pier Height: 120 m. Infrastructure and superstructure project revisions and details have been made by PONTEM in accordance with the construction program of the balanced cantilever section and construction consultancy services are provided until the bridge construction is completed.
Date : 2020 – …